Wholesale Price Track Link Assembly - Track Roller Double Flange – Pingtai

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

continue on to further improve, to make sure product top quality in line with market and consumer standard requirements. Our firm has a excellent assurance program have already been established for Itr Undercarriage Parts, D475 Komatsu Oem Price Full Undercarriage, International Dozer Parts, We persistently develop our enterprise spirit "quality lives the business, credit score assures cooperation and retain the motto inside our minds: consumers very first.
Wholesale Price Track Link Assembly - Track Roller Double Flange – Pingtai Detail:

The function of the track roller is to convey the weight of an bulldozer to the ground . When an bulldozer is run on uneven ground, track rollers carry a tremendous impact. Therefore, the support of track roller is huge. Moreover, if it is of poor quality and is often dusty, it needs a very good sealing to prevent dirt, sand and water from damaging it.

The material of the track roller body is forged by 40Mn2. and the surface heat treatment HRC 48-55 depth up to 5-8mm. Precision CNC machine machining size is more accurate
The material of the center shaft of the track roller forged by 42CrMo.The hardness of surface heat treatment can reach 48-55HRC More wear-resisting . Core hardness of HRC 28 or above is not easy to fracture. Tempering 180 degrees before finishing. The surface of the center shaft of the track roller is polished by CNC machine tool to make the shaft smoother.
High sealing aprons are used inside the track roller to prevent dirt, sand and water from damaging it.
The track roller using friction welding technology welding quality is good and stable, and environmental protection, no pollution.Welding process does not produce smoke or harmful gas, no splash, no lone light and spark, no radiation.Known as the green welding technology of the future.

Product
Description: TRACK ROLLER
Place of origin: China
Brand name: PT’ZM
Price: Negotiate
Packaging details: Fumigate seaworthy packing
Delivery time: 7-30 days
Payment term: L/C T/T
Price term: FOB/ CIF/ CFR
Minimum order quantity: 1 PC
Supply Ability: 10000 PCS/month
Material: 40Mn2/42Crmo
Technique: Forging
Finish: Smooth
Hardness: HRC48-55, depth  5-8mm
Quality: mining operation
Warranty time: 1600hours
After-sales service: Video technical support, Online support
Color: Yellow or Black or Customer required
Application: Bulldozer & Crawler excavator

track roller


Product detail pictures:

Wholesale Price Track Link Assembly - Track Roller Double Flange – Pingtai detail pictures

Wholesale Price Track Link Assembly - Track Roller Double Flange – Pingtai detail pictures


Related Product Guide:

abide by the contract", conforms on the market requirement, joins within the market competition by its superior quality likewise as provides far more comprehensive and great company for shoppers to let them develop into huge winner. The pursue on the corporation, is definitely the clients' gratification for Wholesale Price Track Link Assembly - Track Roller Double Flange – Pingtai , The product will supply to all over the world, such as: Bahamas, France, Myanmar, As operation principle is "be market-oriented , good faith as principle, win-win as objective", holding on "customer first, quality assurance, service first" as our purpose, dedicated to provide the original quality, create excellence service , we won the praise and trust in the industry of auto parts. In the future, We will provide quality product and excellent service in return to our customers , welcome any suggestions and feedback from all over the world.
  • High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
    5 Stars By Caroline from Cyprus - 2018.04.25 16:46
    We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Lydia from Jeddah - 2017.05.02 18:28
    Write your message here and send it to us