China Factory for Front Idler Assembly - PC1250 Front Idler Assembly 21n-30-33110 Komatsu Excavator Undercarriage Parts – Pingtai

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our solutions are widely regarded and trustworthy by consumers and may meet continually modifying financial and social requirements for Excavator Spare Parts Undercarriage, Front End Loader Bucket Teeth, Roller For Track, Our company maintains safe business mixed by truth and honesty to keep long-term relationships with our customers.
China Factory for Front Idler Assembly - PC1250 Front Idler Assembly 21n-30-33110 Komatsu Excavator Undercarriage Parts – Pingtai Detail:

The best advantages of Komatsu PC1250 series undercarriage parts and front idler features. When high quality is a requirement and low cost is necessary, our products is your solution. Excellent with warranty time 6 months to 2 years.

The wheel body of our product is made of 35SiMn with a hardness of HRC55-58 and the deepth reach 6-8mm , which is more wear-resistant. Central shaft material for 42Crmo steel is not easy to fracture. So that the service life of the product is longer.

Our technology uses forging and precision casting, CNC vertical machining production. Precision casting makes the wheel body of high density, no pores and not easy to leak gas. CNC vertical machine is used for more accurate control of product size and higher finish smoothness. And the equipment is better, the operation is safe, the production efficiency is higher,

The technical drawing of the product is 1:1 original size. This will not appear when the customer purchase size deviation can not be installed.

We have a professional QC team, and to follow up the product testing, semi-finished and finished product testing and produce reports.

All products have their own ID number. When customers feedback product problems, we will find the corresponding QC test declaration according to the ID number of the product, find the problem and come up with the solution.

Description:

PC1250 Excavator Idler Assembly Mining Equipment

Place of origin:

China

Brand name:

PT’ZM

Brand name:

Komatsu

Model number

PC1250

Part number

21n-30-33110

Price:

Negotiate

Packaging details:

Fumigate seaworthy packing

Delivery time:

7-30 days

Payment term:

L/C T/T

Price term:

FOB/ CIF/ CFR

Minimum order quantity:

1 PC

Supply Ability:

10000 Sets/month

Material:

35Simn/42Crmo/QT450-10

Technique:

Forging/Precision casting

Finish:

Smooth

Hardness:

HRC55-58, deepth 6-8mm

Quality:

mining operation heavy duty high-end quality

Warranty time:

24 monthes

After-sales service:

Video technical support,Online support

Color:

Black or Yellow or Customer required

Application:

Crawler Excavator


Product detail pictures:

China Factory for Front Idler Assembly - PC1250 Front Idler Assembly 21n-30-33110 Komatsu Excavator Undercarriage Parts – Pingtai detail pictures

China Factory for Front Idler Assembly - PC1250 Front Idler Assembly 21n-30-33110 Komatsu Excavator Undercarriage Parts – Pingtai detail pictures


Related Product Guide:

We can easily normally satisfy our respected buyers with our excellent high-quality, excellent selling price and good service due to we've been far more expert and more hard-working and do it in cost-effective way for China Factory for Front Idler Assembly - PC1250 Front Idler Assembly 21n-30-33110 Komatsu Excavator Undercarriage Parts – Pingtai , The product will supply to all over the world, such as: Kuwait, Algeria, Congo, Over the years, with high-quality products, first- class service, ultra-low prices we win thee trust and favor of customers. Nowadays our products sell all over the domestic and abroad. Thanks for the regular and new customers support. We provide high quality product and competitive price, welcome the regular and new customers cooperate with us!
  • Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Kevin Ellyson from Hamburg - 2018.12.25 12:43
    The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Kimberley from Morocco - 2018.06.28 19:27
    Write your message here and send it to us